Practical guide

Read PM5 Splits and Calculate an Honest Average Pace

Calculate overall pace from total work time and total work distance. A split is a segment of a workout, while “pace per 500 m” is a unit. Averaging the displayed pace numbers is only valid under the right weighting.

Home RowErg, SkiErg and BikeErg owners reading or setting their PM5 · 4 minute read · Published

On this page

Separate the segment from the pace unit

A PM5 single-distance or single-time workout can be divided into splits so you can see how pace changed. A 2000 m row can have four 500 m segments, each with its own pace per 500 m. A longer segment could still display pace per 500 m. The segment length and pace denominator are different things.

Concept2 says workouts generally split into fifths, with exceptions: a 2000 m workout uses 500 m splits and a marathon uses 2000 m splits. You can set your own split length when programming a new workout. Interval workouts use their own work/rest structure rather than this single-workout split format. Check the actual setup or stored result before assuming five equal segments.

Calculate the whole-work pace

Use average pace in seconds per 500 m = total work seconds ×500 ÷ total work meters. For a BikeErg pace per 1000 m, substitute 1000 for 500. Keep rest time out of a work-only average. If you want an elapsed-session figure including breaks, label it separately.

Original equal-distance example: two 500 m segments
SegmentDistanceWork timePace per 500 m
1500 m120 s2:00
2500 m130 s2:10
Whole work1000 m250 s125 s=2:05

On a phone, scroll inside the table to read the remaining columns. Keyboard users can focus the table and use the arrow keys.

Here averaging 120 and 130 gives 125 because the distances are equal. It is a special case of total-time/total-distance calculation, not permission to average arbitrary rows. Work with unrounded times and distances when available; a monitor may round the displayed figures.

Weight unequal-distance splits by distance

Original unequal-distance example
SegmentDistancePace per 500 mImplied work time
1500 m2:00=120 s120 s
21500 m2:20=140 s420 s
Whole work2000 m540×500÷2000=135 s9:00 total; 2:15 pace

On a phone, scroll inside the table to read the remaining columns. Keyboard users can focus the table and use the arrow keys.

A simple average of 2:00 and 2:20 gives 2:10, which is wrong for this record. Three-quarters of the distance was done at 2:20. The weighted calculation is (120×500 +140×1500)÷2000 =135 seconds per 500 m. The total-time method reaches the same 2:15 result.

Use total distance for equal-time segments

Two equal-time segments

An invented workout has 120 seconds covering 500 m, then 120 seconds covering 400 m.

Answer: The overall pace is 240×500÷900=133.333… seconds, about 2:13.3/500 m.

The segment paces are 2:00 and 2:30. Their simple average 2:15 is not the whole-work result. Equal time does not mean equal distance; sum work time and distance first.

Intervals with a break

An invented record has two 500 m work intervals completed in 120 and 130 seconds, with 60 seconds of rest between them.

Answer: The work-only average is 2:05/500 m. An elapsed figure including that rest would be 2:35/500 m and must be labelled as such.

250 work seconds divided by 1000 work meters yields 125 seconds per 500 m. Including the break gives 310 seconds, a different question. Do not replace the PM work summary with an unlabelled elapsed calculation.

Check whether the workout stayed in its original format

Concept2 explains that a single-distance workout ended early is stored as a Just Row/Ski workout. Its original segment plan may therefore disappear from the stored detail. Just Row/Ski records normally use five-minute splits, limited to seven stored splits; for longer pieces the split length increases to keep that limit. If a record looks different, check whether the target was completed before assuming data corruption.

Projected finish on the live screen is a forecast, not a completed split. For a distance target it estimates finish time; for a time target it estimates finish distance. Use the saved result for comparison. If the total cannot be reconciled, retain the workout type, completion status, work/rest fields and original screen labels rather than forcing an average from incomplete data.

Sources and further reading

  1. Concept2: How To Use Your PM5Official PM5 units, display, workout setup and saved-result instructions. Follow the sections relevant to your machine and workout type.