Practical guide
Choose and Set a PM5 Workout: Just Row, Single Time or Distance
Choose the ending condition before you start: open-ended movement, a fixed time, or a fixed distance. The PM5 then counts the relevant target instead of leaving you to infer whether the session is complete.
On this page
Choose the ending condition
| Type | What you enter | What ends the defined work | Useful result |
|---|---|---|---|
| Just Row/Ski/Ride | No fixed time or distance | You end the open-ended piece | Time and distance actually recorded. |
| Single Time | A duration | Programmed time counts down to completion | Total meters at the finish. |
| Single Distance | A distance | Programmed meters count down to completion | Finish time to a tenth of a second. |
On a phone, scroll inside the table to read the remaining columns. Keyboard users can focus the table and use the arrow keys.
Choose the type that matches the written instruction. “Row for 10 minutes” is a time target. “Row 2000 meters” is a distance target. “Record what I do without a planned endpoint” is open-ended. None of these choices determines how hard you should exercise; it only defines how the monitor records the task.
This guide describes the PM5 on Concept2’s RowErg, SkiErg and BikeErg. The menu uses the appropriate Row/Ski/Ride wording for the machine. A different brand’s distance or calorie calculation is not assumed equivalent.
Enter a single time or distance target
- From the Main Menu, choose Select Workout, then New Workout.
- Choose Single Time for a duration, or Single Distance for meters.
- On the setting screen, use plus/minus to change values and left/right arrows to move between digits or fields. Enter the required time or distance.
- Set the split length if the written instruction requires particular result segments. A split divides the record; it is not a work/rest interval.
- Set the PaceBoat/PaceSkier target only if you want a pacing reference. It is separate from the time/distance target that ends the workout.
- Select the checkmark to save the setup. Before beginning, confirm the target, unit and split length on the monitor.
These are documented menu steps, not a physical device test. Firmware can change how some screens are organized. If the screen wording differs, identify the same target fields using the current official PM5 instructions rather than entering values into an unrelated mode.
Read countdowns and projected finish correctly
A Single Time workout counts down from the programmed duration and reports total meters at completion. A Single Distance workout counts down the meters and reports finish time. The live All Data screen can also show projected finish: predicted meters for a time target, or predicted time for a distance target. That forecast can change with your output; it is not a completed result.
An invented recording task says “10 minutes, with 2-minute result segments.”
Answer: Set Single Time to 10:00 and the split length to 2:00.
The five segments describe how the 10 minutes are divided for review. They do not insert rest between segments. The finish quantity is the distance recorded during the defined time.
An invented recording task says “2000 meters, with 500-meter result segments.”
Answer: Set Single Distance to 2000 m and the split length to 500 m.
There are four equal-distance segments. The finishing time answers how long the full 2000 m took; the per 500 m pace is a separate normalized rate.
Use open-ended and preset options deliberately
For an open-ended piece, select Just Row/Ski/Ride from the Main Menu, or begin moving and allow the monitor to start recording. Afterwards, explicitly end the piece and inspect its stored result. Very short pieces may not meet the save threshold; the separate recording guide explains the machine-specific distances and the finish procedure.
The PM includes standard and custom workout lists. Select Workout → Standard List or Custom List opens those choices. A preset is a saved configuration, not a personal recommendation. Inspect the selected target and interval details before starting, especially when using a shared monitor whose custom list may have been changed.
Recognize calorie targets and incomplete work
PM5 also offers Single Calorie: it counts down a programmed calorie target and shows finish time. Calories are calculated by the monitor’s model, so use the calorie guide before interpreting that target as an individual energy measurement. Time, distance and calorie targets are different ending rules.
If you stop a single-distance piece before its target, Concept2 says it is stored as Just Row/Ski. Retain the completion status when comparing records; an incomplete 2000 m setup is not a completed 2000 m result. After finishing, review time, meters and the expected segments in Memory or USB Logbook. If they do not match the written task, correct the setup for the next attempt rather than relabelling this record.
Sources and further reading
- Concept2: How To Use Your PM5Official PM5 units, display, workout setup and saved-result instructions. Follow the sections relevant to your machine and workout type.